How We Work | Bathroom Renovation Process | AdiDeccor
AdiDeccor — Premium Bathroom Renovations
07917 023257Request a consultation
WhatsAppCall
Gold-vein marble-effect wall tiles being set during a renovation

How We Work survey to handover

Five clear steps, one team accountable for the finish, and a single point of contact from first call to final seal.

Next step
Request a consultation See our projects5.0 on Google · ReviewsWhatsApp us
Our process

Five steps,one team.

Round brass mirror and globe wall lights above a vessel basinFreestanding bath against dark panelling with brass wall-mounted tapsOld bathroom floor tiles being broken out during strip-outTerrazzo shower wall tiles set over a tanked wet zoneFinished marble-effect bathroom with timber slat feature wall
01/ 05
  1. STEP 01

    Consultation & survey

    Tell us what you want, your postcode and any photos of the existing bathroom. We visit or video-call, measure up, and talk through layout options, finishes and practical constraints.

  2. STEP 02

    Design & quote

    We help you choose tiles, sanitaryware, shower systems and the waterproofing approach so everything works together, then set out the scope and quote clearly before work starts.

  3. STEP 03

    Strip-out & preparation

    The old suite is removed carefully, with protection for floors and doorways elsewhere in your home. Walls and floors are checked, levelled and made sound.

  4. STEP 04

    Waterproofing & tiling

    Wet zones are tanked as a full system before any tile goes on. Walls and floors are then tiled, levelled and grouted with products suited to the tile.

  5. STEP 05

    Fit-out & handover

    Sanitaryware, glass, fixtures and sealing are fitted and finished. We clean up and walk you through how to care for the new surfaces and systems.

FAQs

Process questions, answered.

How long does a bathroom renovation take?

+

A straightforward ensuite is usually quicker than a full family bathroom with layout changes, electrics and underfloor heating. Waterproofing and adhesives also need cure time before the next stage can start. We give you a project-specific timeline at consultation, including how long you’ll be without a working bathroom.

Can I use my bathroom during the work?

+

Usually not for most of the project. We tell you at consultation how long the room will be out of use so you can plan around it.

Who do I speak to during the project?

+

Anna looks after scheduling and updates, and Adrian leads the work on site, so you always know who to call.

What is tanking and why does it matter?

+

Tile and grout are not waterproof on their own. Tanking is the waterproof layer applied behind the tiles in showers and wet rooms, so water that gets through the finish can’t reach the walls or floor. We tank every shower and wet zone before it is tiled.

Bathroom finished by AdiDeccor
Contact

Ready to planyour bathroom?

Tell us your town or postcode, the type of work and any photos of the existing bathroom. We will reply with clear next steps.